03/25/2026
PicoVolt is proud to announce the successful completion of a full design‑build electrical and low‑voltage infrastructure project for Verco Materials, a leader in ballistic armor and advanced protective technologies. In partnership with Five Points Construction, we delivered a power and technology backbone built for a company operating at the highest standards of the defense and security industry.
Over the past year, our team engineered and installed:
• A brand‑new 4000A, 480V service
• Full electrical build‑out across the facility
• All low‑voltage systems, including structured cabling and network infrastructure
• Security solutions, surveillance, and access control
• Gate controls and perimeter wiring
• Industrial‑grade distribution and equipment designed for long‑term reliability
This project demanded precision, planning, and flawless ex*****on. From the first design meeting to final commissioning, every detail was intentionally crafted to ensure Verco has the power, security, and operational capacity to thrive in this location for years to come.
At PicoVolt, we don’t just install equipment — we build systems that empower our customers’ missions. When performance, safety, and reliability are non‑negotiable, that’s where we excel.
PicoVolt LLC — the electrical and low‑voltage partner trusted by companies who can’t afford anything less than the best.