Westendorf Remodeling & Construction

Westendorf Remodeling & Construction We are a remodeling and construction business focusing on residential remodeling. We also offer serv

This was such a fun and challenging project! I’m proud to have my name in this amazing list of local professionals!
11/17/2025

This was such a fun and challenging project!

I’m proud to have my name in this amazing list of local professionals!

It’s great to be part of such a dynamic team!
01/04/2023

It’s great to be part of such a dynamic team!

It sucks but it's true... Nothing is returning to normal until this s**t clears up. 😭
04/01/2020

It sucks but it's true... Nothing is returning to normal until this s**t clears up. 😭

🥶With weather like this, spring can seem sooo far away, but right now is the perfect time to start thinking about warmer...
01/29/2019

🥶With weather like this, spring can seem sooo far away, but right now is the perfect time to start thinking about warmer weather 😎... and spring projects around your home or business! 🌷🔨🧰.

Call for an appointment.
Free estimates provided.

Stay warm friends! 🔥☀️

Daylight savings time is here ☀️ and spring is right around the corner! 🌷If you are considering home improvements or rem...
03/18/2018

Daylight savings time is here ☀️ and spring is right around the corner! 🌷

If you are considering home improvements or remodeling projects this year, now is the time to start planning your project! 🔨

Call or text me @ (217)-553-6010 or email- [email protected]

Messaging on this page has proven to be less than reliable unfortunately... (I don’t always get the notifications)

Thanks!
Todd

This one is a wrap!  Just a recap of the transformation!
11/04/2017

This one is a wrap! Just a recap of the transformation!

More progress in Piper Glenn this week and last... Island cabinets and trim came in, so I assembled those parts and I mo...
11/04/2017

More progress in Piper Glenn this week and last... Island cabinets and trim came in, so I assembled those parts and I moved the cabinet above the stove up, and out 3” to gain some room between the micro hood and the stove top.

This one will get mostly wrapped up next week as soon as refrigerator panels and trim is back from the paint shop. Counter tops coming soon too!

Had a chance to snap a few pics of this kitchen now that the counters have been installed. They are remarkable! All of t...
10/27/2017

Had a chance to snap a few pics of this kitchen now that the counters have been installed. They are remarkable! All of the colors in the island top pull this kitchen together very nicely. Just a few small details to complete and this one will be wrapped up!

Update- after a bit of fancy custom duct work, the micro hood is installed and vented outside. This one was tricky because if it’s location, but we made it happen... and it looks good too. 👍🏻

This fireplace got a face lift earlier this week. We set the new black granite hearth and surround pieces, and also re-i...
10/26/2017

This fireplace got a face lift earlier this week. We set the new black granite hearth and surround pieces, and also re-installed the mantle piece and trim.

Just a couple more days of work to wrap up this kitchen in Auburn. Counter tops should be installed this week and the do...
10/17/2017

Just a couple more days of work to wrap up this kitchen in Auburn. Counter tops should be installed this week and the door hardware has arrived. Just a few finishing details and a couple of appliances are left to go!

Also in progress... re-furbing the front porch on this historical old house in Auburn. The railings were removed and loo...
10/17/2017

Also in progress... re-furbing the front porch on this historical old house in Auburn.
The railings were removed and loose paint and things that come with age were scraped and power washed off. A quick re-scrape where needed followed by a light sanding and then a good primer and slip resistant finish coat will bring this porch back to life.

Of course there are some repairs to be made first...

Another kitchen in progress. This one in a Piper Glenn condo. We removed the existing cabinets and saved them for re-use...
10/17/2017

Another kitchen in progress. This one in a Piper Glenn condo.
We removed the existing cabinets and saved them for re-use, but re-configured to make the kitchen have a better flow.
We also took out the peninsula with a raised bar counter and will be replacing it with a new 8’ long island with a nice flat countertop.
I had to modify two of the base cabinets to make them work with the new plan... a 48” base cabinet was split in half and the old sink base was cut down from 24” deep to 18”, and got a new floor and back panels.

Also, all of the ceramic tile flooring was removed and replaced with wood flooring.
More pics to come as progress continues....👍🏻

Address

35365 East Frontage Road
Virden, IL
62690

Opening Hours

Monday 7am - 6pm
Tuesday 7am - 6pm
Wednesday 7am - 6pm
Thursday 7am - 6pm
Friday 7am - 6pm

Telephone

+12175536010

Website

Alerts

Be the first to know and let us send you an email when Westendorf Remodeling & Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category