06/06/2026
After wrapping up reinbeck on Wed, headed back to the Loo to start prep on this massive shop floor. 5in thick floor, with v***r barrier and rebar going in Monday. Custom built integral drains by yours truly to fit the massive cast iron grates the customer wanted to use. First time building an integral drain of this size and am super excited to see how it all comes out 😎 Whatever you’re doing in life, keep gettin after it!🤘🏻