10/16/2026
Start to finish, one week.
Day 1 the old turf and walk came out. Then drain tile for the downspouts, a compacted base screeded to grade, and every paver set by hand until the curve came together. Sand swept in to lock it all down.
Thinking about a new walk or entry before winter? Send us a photo: 612-910-1099