🚧Bathroom Completion🚧
We tore out all the old wall tile. We took the shower area back to studs.
We took out the bulkhead.
We ripped out the floor tile and rooted subfloor.
We rebuilt the walls in the shower so everything new would match back up with the old plaster walls.
We installed a new 30x60 maxx shower pan.
We added drywall to the ceiling where old bulkhead was.
We got all the plumbing to code.
We installed a new exhaust fan.
We installed new ceiling light, vanity light, and replaced the old outlet.
We installed wainscoting around the room.
We mudded sanded walls and ceiling. We painted walls ceiling doors and trim.
Installed new click lock flooring.
We installed new medicine cabinet and vanity.
Added a new shower seat and grab bars to the shower.
We also finished ahead of schedule!