Comfort Kool HVAC

Call Directions Website Contact the business

Comfort Kool HVAC Our company is designed to create solutions in the commercial air conditioning, heating, ventilation, refrigeration, and food service industries.

We are your all inclusive design, installation, maintenance, and service company!

09/11/2026

Never forget. 🇺🇸

09/04/2026

Welp it’s , what could possibly go wrong with this ⚡️ special. Hope everyone is gearing up to enjoy their 🇺🇸

08/17/2026

Part 3 — Chiller Install & Commissioning - The Pay Off 🔧❄️

Everybody wants to see the finished product. Nobody wants to see what it took to get there. We’re showing you both.

This one didn’t come easy — every chiller has its own personality when it comes to startup. We’re talking full teardown-to-build: cutting schedule 80 pipe, fresh grooved couplings on the inlet/outlet, fabricating every schedule 80 black pipe , dialing in the elbows, adapters, and vibration eliminators so nothing transmits stress back into the system.

Honestly? By the time we got to electric and controls, that was the easy part 😅

End of the day, stamped it during — official seal of approval. That’s the moment that makes all the cutting, rigging, and double-checking worth it.

Nothing better than watching hard work and planning turn into equipment running clean in its new home. 💪

Now we just need to insulate these lines and lock in the maintenance contract. 🤑

08/07/2026

Part 2 🚨 Rigging day is here — and this chiller made it a good one. 🔧

What you don’t see: the hours of planning and triple-checking that happen before the crane even shows up. One wrong move on a day like this and it’s a very expensive mistake. This is why the right team matters. 👷🏽👷🏼‍♀️🏋️‍♂️

Out with the old, in with the new. 🏗️
“We get it up in a hurry”

Part 3 will be brining this beast to life showing the install and startup. You won’t want to miss it. 🔥

Think you’ve got what it takes to run a job like this? Give us a call !

08/03/2026

Part 2 🔧 — McQuay Chiller Decommission
✅ Recovered the refrigerant
⚡️ Killed the 460V power feeding the unit
🧃Drained the propylene glycol from the shell & tube heat exchanger and disconnected inlet/outlet piping
🔌 Disconnected controls and main power
🛠️ Freed up vibration eliminators and mounting bolts, cleaned up remaining piping connections — unit is now fully staged for rigging

There is a lot of planning that goes into replacing a chiller. Every step from scheduling the downtime to kicking off the disconnect needs to go smoothly to get the clients up and running ASAP.

Part 3 dropping soon — rigging day 🏗️

07/22/2026

10,000 lbs of chiller doing a little sky ballet 🎪 Yeah, we put on our big boy pants for this one. This ain’t our first rodeo, but swapping out this 140-ton beast was a fun one — here’s the old McQuay unit coming out to make room for the new . More parts of this project dropping soon, keep an eye out 👀

👷🏼

07/13/2026

⚡ 4x Daikin 3-Ton Split Systems — Day ⚡

Installation isn’t just step one — it’s the whole game. Get it right here, and this system runs clean for the next 15 years. Get it wrong, and no amount of maintenance saves it later.

Charge dialed in. Lines set. Controls wired clean. This is where the life of the system gets decided. 🔧🌡️

07/04/2026

Grateful for the country that lets us wake up every day and keep NY cool, comfortable, and running — from Manhattan rooftops to Montauk docks. Happy 4th of July from all of us at Comfort Kool. 🇺🇸🎆

06/25/2026

Rise and grind with a healthy maintenance 💦🔫. These work horses of condensers need some love to keep up with the summer season❤️ . It is simple maintenances like this which helps to prevent emergency service calls to us 🙃. Comfort Kool HVAC

06/09/2026

Want to hear what a dying chiller sounds like? 🔊

This McQuay 140-ton is cooked. 20+ years old, sitting right next to the ocean — salt air got into everything. This refrigerant circuit is telling us bedtime stories in error codes.

When a machine this size gives up, it doesn’t go quietly. It rattles, it groans, it throws faults like it’s trying to say something before the lights go out.

140 tons of cooling. Gone.

Time to spec the replacement. 💀❄️

Address

1200 Shames Drive
Westbury, NY
11590

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 4pm

Telephone

(516)5957003

Alerts

Be the first to know and let us send you an email when Comfort Kool HVAC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Comfort Kool HVAC:

Shortcuts

Share