Aldon Electric Inc.

Aldon Electric Inc. Established by Allen and Donald Mullaney, Aldon Electric has been serving the Commercial and Industrial Electrical needs of Greater Boston since 1986.

Established by brothers Allen and Donald Mullaney in 1986, the company has grown from the original two founders up to its present size, employing 100 tradesmen and professionals in the electrical contracting business. Aldon now has an agreement with Local 103 of the International Brotherhood of Electrical Workers as well as being a signatory to Local 223, and is looking forward to long lasting bus

iness relationships along with the utilization of highly skilled electrical tradesmen. Expanding into the design/build side of the business, Aldon has proven to be exceptionally capable and is now involved in network cabling to facilitate Information Systems connectivity.

🎙️ Big news! Aldon was featured on The Deep Dive podcast—talking about how it all started, where we’re going, and why we...
06/27/2025

🎙️ Big news! Aldon was featured on The Deep Dive podcast—talking about how it all started, where we’re going, and why we’re passionate about powering the future.

🎧 Tap the link in below to visit the News section on our website to give a listen. http://www.aldonelectric.com/news.html

09/02/2024
Aldon Electric would like to honor the brave souls who made the ultimate sacrifice for our freedom. We express gratitude...
05/26/2024

Aldon Electric would like to honor the brave souls who made the ultimate sacrifice for our freedom. We express gratitude for the bravery of all our fallen American soldiers. Wishing everyone a Memorial Day filled with reflection and appreciation for our heroes.

⚡️ 💪🏼
01/04/2024

⚡️ 💪🏼

12/25/2023

Merry Christmas & Happy New Year to all our hard working staff and crews! Wishing you all a happy, healthy holiday season and some well-deserved rest and relaxation!

100 Forge is a fully occupied state-of-the-art, all-glass, nine-story life science building that began welcoming tenants...
10/04/2023

100 Forge is a fully occupied state-of-the-art, all-glass, nine-story life science building that began welcoming tenants at the end of 2022. At 165,600 sq ft, the tower is the first purpose-built lab building in Watertown in the heart of amenity-rich Arsenal Yards.

99 Coolidge Avenue, the newest life science project in Watertown, will reside on the six acre property formerly occupied...
09/27/2023

99 Coolidge Avenue, the newest life science project in Watertown, will reside on the six acre property formerly occupied by the Mt. Auburn Club. The five story, 255,000 SF building is being built to the highest sustainable standards; and it will achieve LEED v4 Gold certification and exceed the Massachusetts Stretch Energy Code standard for reduced energy consumption by 40%. On-site parking will be housed in an efficient 6-story above grade garage which will directly connect to the building via an enclosed, second story bridge.

Beyond its LEED certification, the building will be built with ultra-efficient building mechanical systems, an enhanced façade and a highly efficient envelope design. Additionally, both buildings will support a robust solar array on each roof that will produce 780kwh energy on an annual basis for on-site energy consumption.

Converting the former Edward J. Sullivan Courthouse and jail in East Cambridge into a mixed-use office, residential, and...
09/13/2023

Converting the former Edward J. Sullivan Courthouse and jail in East Cambridge into a mixed-use office, residential, and retail development. The interior and exterior renovation will deliver a vibrant development that is integrated into the residential and commercial neighborhood.

The Suffolk Downs redevelopment is a multi-phased project that will transform the former horse racing track into a mixed...
09/05/2023

The Suffolk Downs redevelopment is a multi-phased project that will transform the former horse racing track into a mixed-use neighborhood.

The Suffolk Downs redevelopment is one of the largest real estate projects in Boston's history. It will be located on the border of East Boston and Revere, about five miles north of Downtown Boston.

The chillers are in at the 99 Coolidge Ave! The newest life science building project in Watertown, MA.The five story, 25...
06/30/2023

The chillers are in at the 99 Coolidge Ave! The newest life science building project in Watertown, MA.

The five story, 255,000 SF building is being built to the highest sustainable standards; and it will achieve LEED v4 Gold certification and exceed the Massachusetts Stretch Energy Code standard for reduced energy consumption by 40%. On-site parking will be housed in an efficient 6-story above grade garage which will directly connect to the building via an enclosed, second story bridge.

Address

38 Greenwood Avenue
Weymouth, MA
02189

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+17813370222

Alerts

Be the first to know and let us send you an email when Aldon Electric Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Aldon Electric Inc.:

Share

Category