06/19/2026
Job completed in Harvey’s Lake today.
Before and after pics
Man this was a tricky one!
2nd story hanging over front porch that dropped over 5” over time.
Complete tear out!
14-18” footings,
2x12 beams tripled up,
5-12” LVL beams tripled up
Load points of existing 2nd floor transferred properly,
Jacked everything up as much as house let us.
Timber Tech Driftwood decking
Finyl Line railing
Privacy lattice