08/29/2026
Complete master bathroom remodel. Tore out the entire bathroom of mud and lathe tile to the studs including the tile floor that was mud and lathe. Enlarged bathroom into a hall closet, moving the shower over to that area. All of the floor joices were bad and had to be replaced. New 3/4" plywood on the floor of the whole bathroom .
New cultured marble shower with a corner seat, 2 corner shelves. New cabinet with new vanity top.
Thank you to the Bond family for allowing us to handle your bathroom remodel.
For information or a free estimate contact Val Lewis at 940-767-0664