03/29/2017
During spring turn-ons we:
-Turn-On the water and check for leaks on the mainline.
-Run each station of the system by the controller to insure the valves are operating correctly.
-Check each spray head to insure the proper coverage pattern.
-Check each rotor head to make sure it is turning and spraying properly.
-Check for proper pressure and insure there are no leaks on the zone lines.
-Reprogram the sprinkler controller for a baseline spring watering schedule.
-Test the backflow preventer if the system is on city water.
-Repair or replace any faulty components.
-Straighten, raise and adjust heads as needed.