08/27/2026
This week at the Derby Water Treatment Plant construction site UCI poured 186 cubic yards of concrete for the raw pump station. This pour was 50 x 67 feet and the second of four slabs. Water will be piped to the raw water pump station from four different Derby wells.
Derby, Kansas City Hall Professional Engineering Consultants Yaeger Architecture, Inc.