05/16/2024
And that’s a wrap (for now) at the rice storage facility near Biggs. The concrete company has to pour what we’ve got done and let it cure so that trucks can drive on it so that we can get the final section done. It should take about a week to cure. Then we spotted gravel along side where the valley gutter is going so that later on we can dress up the sides of it also. We still have two rolls of fabric and that should more than cover the remaining road. We do have to order five more loads of engineered fill to finish up when we return. In the meantime, on to other projects. 🇺🇸🇺🇸🇺🇸