J.H. LaPierre Jr. & Son LLC Electrical Contractors

J.H. LaPierre Jr. & Son LLC Electrical Contractors 24 Hour emergency service

04/24/2022

Thank you J.H. LaPierre Jr. & Son LLC Electrical Contractors for becoming our next BRONZE LEVEL Sponsor for the 1st Annual RIDE FOR BACKPACKS in Support of Recovery! We appreciate your support!!

If you are interested in becoming a sponsor, you can find more info here: https://www.stevensstockingsinc.com/sponsor-info!

From all of us at J.H. LaPierre Jr. & Son, we wish you all a Merry Christmas and a Happy and Healthy New Year.
12/25/2018

From all of us at J.H. LaPierre Jr. & Son, we wish you all a Merry Christmas and a Happy and Healthy New Year.

Structural repairs, modifications and lift column replacements at BDL Jetway 29.
11/19/2018

Structural repairs, modifications and lift column replacements at BDL Jetway 29.

JSL Asphalt completed office building project pictured below are the main vestibule, interior offices, kitchen, lavatory...
11/12/2018

JSL Asphalt completed office building project pictured below are the main vestibule, interior offices, kitchen, lavatory, work area, and conference room.

General Contractor for the Construction of the JSL Asphalt office building at the Windsor Locks Plant including MEP's an...
09/26/2018

General Contractor for the Construction of the JSL Asphalt office building at the Windsor Locks Plant including MEP's and all interior office fit-outs.

Winter Construction at the ASIG Bulk Fuel Storage Facility at BDL Hartford.
02/06/2016

Winter Construction at the ASIG Bulk Fuel Storage Facility at BDL Hartford.

Load testing to 53,000 lbs of The Fedex tether boxes, the final stage of the project.
11/16/2015

Load testing to 53,000 lbs of The Fedex tether boxes, the final stage of the project.

We are completing Construction of the Tether Boxes which are designed to anchor down the nose gear of the FedEx Freighte...
11/10/2015

We are completing Construction of the Tether Boxes which are designed to anchor down the nose gear of the FedEx Freighters while loading here at BDL.

Concrete Pour FedEx BDL. A  busy day for MDB Construction!!!!
10/27/2015

Concrete Pour FedEx BDL. A busy day for MDB Construction!!!!

Phase I  ramp extension and Aircraft Tether Support project now started at the FedEx facility at BDL. This project is to...
10/15/2015

Phase I ramp extension and Aircraft Tether Support project now started at the FedEx facility at BDL. This project is to accommodate the MD-10 & 11 aircraft. Phase II will be the installation of anchor points within the tarmac anchoring the nose of the aircraft when loading. These tethers will be tested at 50,000lbs. JHL is acting as the General Contractor and MDB Construction of Suffield is responsible for all excavation and concrete placement.

1 million gallon fuel storage tank being relocated at Bradley Int'l Airport one part of The Bulk Fuel Storage Facility u...
10/14/2015

1 million gallon fuel storage tank being relocated at Bradley Int'l Airport one part of The Bulk Fuel Storage Facility upgrades. JHL is responsible for upgrading and installing new electrical services, control systems and emergency generators for this project.

The demolition and construction has begun on the new Pool Filter Building and filtration systems at  Pesci Park here in ...
10/03/2015

The demolition and construction has begun on the new Pool Filter Building and filtration systems at Pesci Park here in WL. We are the General Contractors for this project and responsible for the final design drawing's as well as performing all MEP's in house.

Address

445 Spring Street
Windsor Locks, CT
06096

Alerts

Be the first to know and let us send you an email when J.H. LaPierre Jr. & Son LLC Electrical Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to J.H. LaPierre Jr. & Son LLC Electrical Contractors:

Share

Category