05/01/2026
There’s a pile of work left to do on this project, but the day ended with getting a new water service installed today. The big win was getting the pipe sleeve installed and operational under the patio, which prevented tearing out and pouring new concrete. A giant tree stump hindered progress slightly, however I was able to make it work.
Yesterday I assisted the Dexter city guy with installing a new water service from the main to the meter which included installing a new meter pit.
Next week I’ll tackle the sewer!!
Happy Friday!