10/09/2026
Framing is coming along nicely on this addition here in the Lakes Region. The first floor walls are up and sheathed with ZIP System, the subfloor is down, and the second floor is carried by a CP-LAM 2.1E 3100Fb beam, so the structure is solid and ready for what comes next. Temporary bracing is holding everything true while we build out the rest.
It's always exciting to see a space go from a plan on paper to something you can actually walk through. You can already picture the light coming through those window openings and the view of the trees beyond.
Every project we take on gets the same care, from the first stud to the final trim. If you've been thinking about adding space to your home, we'd love to talk it through with you.
North Line Home Renovations, serving the Lakes Region. Message us anytime for a free estimate.