Metzger Custom Construction

Metzger Custom Construction I'm a current student at DACC. I'm happy to offer my building services for a variety of projects.

Please reach out to me via email at [email protected] with questions or details regarding your project and I will be in touch.

First off I want to give a huge thanks to Tom Beckley and the Beckley family for giving me my first big job! I was asked...
11/29/2022

First off I want to give a huge thanks to Tom Beckley and the Beckley family for giving me my first big job! I was asked to hire a crew and come into this pre-built pole barn and do some larger scale framing work. Throughout this process, me and my four man crew built walls out of 2x6s with a treated board on the floor that would go on the exterior walls. We then built a 2x4 wall down the center of the building with treated board on the floor again. Finishing off with 2 bedroom walls, with a closet wall and a bathroom wall laying inside of it, and 2 more bathroom walls in the garage area with a ceiling.

Me and my crew finished this project on November 23rd and took roughly 20 hours to complete. Can’t wait to see what’s in store next with the Beckley project or whatever project comes next!

Finished this project around November 3rd. I was asked take this opening to this bathroom, and install a door, as well a...
11/29/2022

Finished this project around November 3rd. I was asked take this opening to this bathroom, and install a door, as well as trim around the door so that the family could have some more privacy in the bathroom. I hung a door, did trim work and caulking as well as painted over the trim and the door. Very grateful that the family could install the door k**b on their own!

I want to thank Erin West and her family for giving me the opportunity to work in their home!

This is a job I finished up around the end of October. I was asked to take this small storage space with a cubby door an...
11/29/2022

This is a job I finished up around the end of October. I was asked to take this small storage space with a cubby door and completely renovate and finish. I started by moving the light switch and some electrical work inside the storage area towards the right side of the wall. After that I framed out an opening for a door and hung the door. I went on to hang drywall, mud and tape, lay flooring, install trim, and to finish it all of by painting the walls and installing a doork**b.

I want to the thank Nicole Rouhana for being one of my first big customers and letting me work for her!

I cut 2x4’s in half, took a router to the edges, painted, stained, burned, screwed together and engraved into this wood ...
09/21/2022

I cut 2x4’s in half, took a router to the edges, painted, stained, burned, screwed together and engraved into this wood to make a unique wooden American flag.

I found, cut, and braced together these wood pallets to make a bed frame.
09/21/2022

I found, cut, and braced together these wood pallets to make a bed frame.

A cut and put together this two layered industrial style table.
09/21/2022

A cut and put together this two layered industrial style table.

Address

Worthington, OH

Website

Alerts

Be the first to know and let us send you an email when Metzger Custom Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Metzger Custom Construction:

Share

Category