P Coates Building & Maintenance ltd

  • Home
  • P Coates Building & Maintenance ltd

P Coates Building & Maintenance ltd All types of building work undertaken
• Extensions & new builds
• Alterations & repair

28/06/2025

🤩🤩 Absolutely stunning 🤩🤩

Take a look at this barn conversion we have recently completed in Abbots Bromley.

Now on the market and looking to be turned into a home.

We are very proud of the outcome and it’s been a pleasure to work on from start to finish.

It must be render weather ☀️☀️🕶️🕶️☀️☀️
18/06/2025

It must be render weather ☀️☀️🕶️🕶️☀️☀️

Installation of a metal standing seam roof to a current steel frame barn conversion 💪👌👍
05/06/2025

Installation of a metal standing seam roof to a current steel frame barn conversion 💪👌👍

Installation of block and beam floor on current new build project 💪👌👍
23/05/2025

Installation of block and beam floor on current new build project 💪👌👍

🤩🤩 steel barn conversion 🤩🤩Roof makeup 18mm osb on top of the roof joists ✅Breather membrane ✅110mm pit insulation ✅18mm...
19/05/2025

🤩🤩 steel barn conversion 🤩🤩

Roof makeup

18mm osb on top of the roof joists ✅
Breather membrane ✅
110mm pit insulation ✅
18mm osb ✅
Colou coat urban membrane ready for standing seam roof ✅

🤩🤩 current new build project 🤩🤩Floor prep prior to block and beam installation 👍👌💪
09/05/2025

🤩🤩 current new build project 🤩🤩

Floor prep prior to block and beam installation 👍👌💪

Floor beams delivered and beginning to set out new build project 👍👌💪
05/05/2025

Floor beams delivered and beginning to set out new build project 👍👌💪

🤩🤩 The start of new build project 🤩🤩Building set out ✅Footings poured ✅Trench blocks loaded out ✅
30/04/2025

🤩🤩 The start of new build project 🤩🤩

Building set out ✅
Footings poured ✅
Trench blocks loaded out ✅

2 storey extension in Uttoxeter Kitchen removed ✅Wall removed and steels installed ✅Floors insulated and prepped ✅Concre...
29/04/2025

2 storey extension in Uttoxeter

Kitchen removed ✅
Wall removed and steels installed ✅
Floors insulated and prepped ✅
Concrete mixed on site and new floor laid ✅
Doorway cut out to allow access to new bedroom ✅
Roof insulated ✅
First fix plumbing and electrics underway✅

🔨 Steel framed barn conversion 🔨This huge build is beginning to take shape 👌👍💪290m2 22mm chipboard floor installed ✅8x2 ...
14/04/2025

🔨 Steel framed barn conversion 🔨

This huge build is beginning to take shape 👌👍💪

290m2 22mm chipboard floor installed ✅
8x2 timber frame walls erected ✅
Scaffolding up ✅
Huge 9x3 timber roof purlins installed✅

150mm solid Concrete block internal walls and 8x2 timber framework going up on a current barn to allow us to install the...
16/02/2025

150mm solid Concrete block internal walls and
8x2 timber framework going up on a current barn to allow us to install the first floor pozi joists 🔨🪚🏡💪👌👍

Concrete floor broken out today to allow us access to alter drains and electrics. Crushed on site ready to go back in as...
13/02/2025

Concrete floor broken out today to allow us access to alter drains and electrics.

Crushed on site ready to go back in as sub base 💪💪♻️♻️👍👍