Draco Group

Draco Group Based in Johannesburg, Draco Group is set to become one of South Africa's leading turnkey demolition and construction company.

Specialized Demolition, Rehabilitation and Asbestos Removal Company

The Old Assembly Building at the Parliament of SA restoration project demanded the simultaneous management of controlled...
03/06/2026

The Old Assembly Building at the Parliament of SA restoration project demanded the simultaneous management of controlled demolition, asbestos abatement, structural rehabilitation, and extensive temporary works, all within a live, high-security national key point, without interrupting the operations of Parliament.

This required more than technical delivery. It called for strategic sequencing, disciplined coordination across specialist teams, and rigorous risk management at every stage, ensuring safety, compliance, and continuity were never compromised.

It is within this level of complexity that Draco Group’s expertise proved most consequential, not only in ex*****on, but in enabling progress within one of the country’s most sensitive and operationally constrained environments.
www.dracogroup.co.za

We’re heading to the Big 5 Construct South Africa.The Draco Group is proud to be part of one of the industry’s leading c...
02/06/2026

We’re heading to the Big 5 Construct South Africa.
The Draco Group is proud to be part of one of the industry’s leading construction events.

Come visit us at Stand J22 and meet the team behind some of South Africa’s most technically demanding projects.

The Park Vista Project showcases extensive capabilities of Draco Group:- Structural demolition- Masonry removal- Steel d...
29/05/2026

The Park Vista Project showcases extensive capabilities of Draco Group:
- Structural demolition- Masonry removal
- Steel dismantling
- Plumbing and fixtures removal
- External clearing and site prep
- Crushing and recycling

Delivered as a complete, turnkey demolition solution.
www.dracogroup.co.za

The Park Vista demolition was executed using a controlled top-down methodology, supported by:– Hydraulic excavators– Dem...
27/05/2026

The Park Vista demolition was executed using a controlled top-down methodology, supported by:
– Hydraulic excavators
– Demolition attachments
– Dust suppression systems
– Strict safety zones

Every step planned and every risk managed.
www.dracogroup.co.za

The restoration of the Old Assembly Building at the Parliament of SA, was not approached as a project, but as a national...
26/05/2026

The restoration of the Old Assembly Building at the Parliament of SA, was not approached as a project, but as a national responsibility. Working within one of SA’s most historically and constitutionally significant spaces, every intervention required a careful balance between preservation and progress, ensuring the building met modern safety standards without compromising its architectural legacy.

This required a deliberate, strategy-led approach: aligning heritage conservation with regulatory compliance, managing complexity within a live Parliamentary environment, and safeguarding both the integrity and future functionality of the structure.

This is what it meant to build with purpose.
www.dracogroup.co.za

Effective demolition is defined by how a structure is deconstructed before it is brought down. At Park Vista, Draco Grou...
25/05/2026

Effective demolition is defined by how a structure is deconstructed before it is brought down.

At Park Vista, Draco Group executed a comprehensive interior strip-out, including over 580 m² of glass windows, 249 m² of timber doors, and 3,400 m² of carpet tiles, alongside the removal of stone counters, built-in joinery, air-conditioning units, roller shutters, and associated fixtures.

All salvageable materials were systematically recovered and segregated in line with responsible resource management practices, maximising value retention while minimising waste.

A measured, methodical approach where deconstruction is as critical as demolition.
www.dracogroup.co.za

Demolition, when executed with intent, extends far beyond site clearance.  At Park Vista, Draco Group processed approxim...
21/05/2026

Demolition, when executed with intent, extends far beyond site clearance. At Park Vista, Draco Group processed approximately 8,170 tons of concrete and masonry rubble on-site, converting it into recycled aggregate for reuse in future construction phases.

This approach reduces reliance on landfill, optimises project cost efficiencies, and contributes to a more sustainable construction lifecycle. A considered, circular methodology, where demolition becomes a catalyst for what comes next.

www.dracogroup.co.za

At the Park Vista development, Draco Group executed the removal of substantial structural elements, including over 1,800...
19/05/2026

At the Park Vista development, Draco Group executed the removal of substantial structural elements, including over 1,800 m³ of concrete slabs, 220 m³ of columns and bases, 1,700 m² of surface beds, and 90 m³ of foundations.

Delivered through a controlled, top-down methodology, the works were undertaken using hydraulic excavators equipped with specialised demolition attachments, ensuring accuracy, structural control, and strict adherence to safety and environmental protocols.

This is demolition engineered with intent, where power is matched by precision, and ex*****on is governed by discipline.
www.dracogroup.co.za

Draco Group was appointed to deliver the full-scope demolition of the Park Vista development, encompassing structural co...
13/05/2026

Draco Group was appointed to deliver the full-scope demolition of the Park Vista development, encompassing structural concrete, masonry, internal strip-out, steelwork removal, external clearing, and the on-site crushing of over 8,170 tons of material.
From regulatory approvals through to final site readiness, this project reflects a fully integrated, methodical approach to turnkey demolition, defined by precision, control, and disciplined ex*****on.
www.dracogroup.co.za

We are proud to be a finalist in two categories in the Big 5 Construct South Africa Impact Awards 2026!Contractor of the...
13/05/2026

We are proud to be a finalist in two categories in the Big 5 Construct South Africa Impact Awards 2026!

Contractor of the Year
Digitalisation Project of the Year

A reflection of the work, innovation, and commitment our team brings to every project, every site, and every challenge.

Address

Ferndale
2194

Opening Hours

Monday 07:00 - 17:00
Tuesday 07:00 - 17:00
Wednesday 07:00 - 17:00
Thursday 07:00 - 17:00
Friday 07:00 - 17:00

Alerts

Be the first to know and let us send you an email when Draco Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Draco Group:

Share