B & V Contractors

B & V Contractors Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from B & V Contractors, Contractor, 25 Sandpiper Street, Industrial area, Knysna.

24/11/2025

TEMPORARY MANHOLE AND SINKHOLE REHABILITATION IN KNYSNA CBD 📢

The Municipality will be undertaking temporary works to sewer manholes and sinkhole-related rehabilitation within the CBD. These upgrades aim to address essential infrastructure needs and ensure the safety and proper functioning of the sewer system in affected areas. 🛠️

🚦 Streets Affected

• Intersection of Grey & Rawson Streets
• Intersection of Rawson & Mortimer Streets
• Clyde Street
• Waterfront Drive
• Mortimer Street

📍 Scope of Work:
1. Rawson, Mortimer, Grey Street Intersections

At these intersections, the following tasks will be carried out:
• Excavation to expose existing manhole cover slabs
• Removal of existing cover slabs
• Compaction of the in-situ layer
• Addition of a levelling layer using sandbags
• Installation of new 1.8m diameter cover slabs
• Backfilling at the sides of the cover slabs
• Application of premix to the sides

Each intersection is expected to take approximately 3 days to complete. Temporary road closures will be in effect on Gray Street, Mortimer Street, and Rawson Street during this time. 🚧

2. Clyde Street, Waterfront Drive, Mortimer Street

The planned works include:
• Excavation to expose the sewer pipe
• Repair of the exposed pipe
• Backfilling of the excavation
• Completion of road layers, including G5/G4 and premix layer

Repairs are estimated to take 3 days, depending on pipe depth and water table levels. The Mortimer Street repair will require extra steps such as dewatering and shoring, adding approximately 5 more days. 🕒

🗓️ Project Schedule

• Grey & Rawson Street Intersection: Commencing Wednesday, 26th November
• Rawson & Mortimer Street Intersection: Commencing Monday, 1st December
• Clyde & Waterfront Drive: Planned to commence together on Wednesday, 3rd December
• Mortimer Street Repair: Commencing Thursday, 4th December

The main contractor B&V Contractors will undertake the work. For queries, please contact Mr. Marcel Geldenhuys at 083 305 0343.📞

For urgent issues, kindly contact the Infrastructure Directorate Helpdesk at 044 302 6331 /6334.📞

We appreciate your patience and cooperation during these essential works. 🚧



The Greater Knysna Business Chamber Knysna Infrastructure Group - KIG Visit Knysna Knysna 97.0 FM & MC 90.3 FM Plettenberg Bay Peter Bester DA Councillor Ward 10 Knysna Knysna Executive Mayor Cllr Thando Matika

Knysna’s brand-new pump track, check it out 🚴
06/11/2025

Knysna’s brand-new pump track, check it out 🚴

We traveled to Knysna, western cape South Africa to build two pump tracks and an MTB skill trail.

Bertie Barnard School – Still bay West• Client: Western Cape Government• Project management: H&I• Engineer: Invictus / M...
05/11/2025

Bertie Barnard School – Still bay West
• Client: Western Cape Government
• Project management: H&I
• Engineer: Invictus / Maynard Johnson
• Contractor: B & V Contractors
• Contract: New boundary retaining wall

Scope of work
• Demolition of brick boundary retaining wall
• Bulk earth works / excavation
• Reinforced concrete foundation
• Construction of reinforced concrete retaining wall
• Backfilling behind new concrete wall
• Removal of old services (sewer)
• Installation of new sewer gravity line with new manhole construction
• New stormwater channel installation (ditch liner)
• New boundary fence line installation

25/11/2024

Address

25 Sandpiper Street, Industrial Area
Knysna
6571

Telephone

+27443825567

Website

Alerts

Be the first to know and let us send you an email when B & V Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category