16/06/2026
🚧✨ BATHROOM TRANSFORMATION COMPLETE ✨🚧
From demolition to dream bathroom in under 7 days! 🔥
This project at the Mehlape residence involved extensive demolition work to completely reconfigure the space, including relocating the bathtub and installing a concealed cistern system for a sleek, modern finish.
The final result features:
✔️ Freestanding bathtub
✔️ Floating toilet with concealed cistern
✔️ Floating vanity and basin
✔️ Matte black tapware throughout
✔️ Frameless glass shower wall
✔️ Built-in shower bench
✔️ Stunning Cyber Stone and Alabaster White polished tiles
Every detail was carefully considered to create a contemporary, luxurious space that is both functional and beautiful.
We’re incredibly proud of our team for delivering this complete makeover in less than a week. Projects like these remind us why we love what we do.
Thinking of renovating your bathroom or giving your home a fresh new look? We’d love to help bring your vision to life.
📞 Contact WOL Construction today for your next renovation project.