21/05/2026
Otter Bridge
New bridge loading...
The Otter Bridge project completion is coming to fruition, linking Canal Walk Shopping Centre directly to the residential area across the Century City canal. The massive steel structure was delivered in one piece and hoisted into position.
We are on track for a June 2026 completion.
π www.mdsapm.co.za