03/08/2026
Before ➡️ During ➡️ After
This project was completed properly—not painted around.
All electrical accessories, cover plates and the air-conditioner covers were removed so that the walls and ceilings could be prepared and painted behind them. They were then neatly refitted after painting.
The existing light fittings were cleaned and refurbished, as some had been damaged.
Work included ceiling repairs, plastering, cornices, painting and detailed finishing.
ATOM Electrical and Construction
Call or WhatsApp: 066 227 0396
Email: [email protected]