17/06/2026
Day 37 at Rutanhi Beverages, Ruwa. Brickwork rising. Formwork standing. Concrete settling into shape.
Walls are climbing course by course in the bottling hall extension β straight, true, checked with a spirit level on every lift. Around the substation, shuttering has gone up clean and square, ready to hold the next pour. Cables are being laid into open trenches. A footing has just been struck and stripped, the concrete inside it already cured hard and grey.
Fourteen days to go. This is what fourteen days of pressure looks like when a team refuses to drop the standard.
Frontline (Private) Limited. We do not finish soft. We finish exactly the way we started β hard.
π Rutanhi Beverages Bottling Plant Extension | Ruwa, Zimbabwe