StreamTec Geosynthetics Pvt Ltd

StreamTec Geosynthetics Pvt Ltd Geomembrane Production & Installation | Heap & Vat Leaching Systems | Dam & Reservoir Linings | Turnkey Mining & Water Containment Solutions
(1)

Good afternoon Zimbabwe πŸ‡ΏπŸ‡Ό
08/08/2026

Good afternoon Zimbabwe πŸ‡ΏπŸ‡Ό

FROM A MOUNTAINSIDE TO AN ENGINEERED HEAP-LEACH PAD! β›°οΈβž‘οΈπŸ—οΈWhen we arrived, there was no level platform only a steep, tr...
04/08/2026

FROM A MOUNTAINSIDE TO AN ENGINEERED HEAP-LEACH PAD! β›°οΈβž‘οΈπŸ—οΈ

When we arrived, there was no level platform only a steep, tree-covered mountainside and a serious engineering challenge.

We surveyed the site, cleared the working area, cut deep into the hillside, moved massive volumes of earth, spread the material and began shaping the foundation of a 30,000-tonne heap-leaching facility.

The transformation you see today was built through long shifts, heavy machinery, careful planning and a team determined to make it happen.

This is more than earthmoving.
This is engineering.
This is teamwork.
This is the journeyβ€”from a mountain to a mine-ready pad. πŸ‡ΏπŸ‡Ό

And we are only getting started! 🚜πŸ”₯

πŸ“ž Call/WhatsApp: +263 78 414 4374
πŸ“ž Call/WhatsApp: +263 77 392 6249

[email protected] | [email protected]
533 Goodman Road Hatfield Harare

30/07/2026

A beautiful day somewhere in the heart of Masvingo! β˜€οΈβ›οΈπŸšœ

The excavations are taking shape, the project is progressing well, and everyone is pleased with the work achieved so far.

One cut at a time, the heap-leach pad is coming to life. Watch this space! πŸ‘€πŸ”₯

For heap-leaching, VAT-leaching and mining engineering solutions:

πŸ“ž Call or WhatsApp:
+263 78 414 4374
+263 77 392 6249

πŸ“§ [email protected]
🌐 www.streamtecgeo.co.zw

28/07/2026

πŸŒ… ANOTHER PRODUCTIVE DAY IN MASVINGO! β›οΈπŸ‡ΏπŸ‡Ό

And we call it a day from our Masvingo site…

One more day of hard work, progress and building Zimbabwe’s mining futureβ€”one heap-leaching project at a time! πŸ’ͺ🏾πŸ”₯

Got gold ore? Planning a heap-leaching project? Let’s talk!

πŸ“ž Call or WhatsApp:
+263 78 414 4374 | +263 77 392 6249

28/07/2026

Another day, another project update....

Good morning from Makaha.

27/07/2026

🚨 MASVINGO, WATCH THIS SPACE! 🚨

We came.
We excavated.
Now we’re building a heap-leach padβ€”somewhere in the heart of Masvingo! β›οΈπŸšœπŸ”₯

From untouched mountainous terrain to engineered gold-recovery infrastructure, our team is working day and night to bring this project to life.

This is only the beginning. Follow the journey and watch the transformation unfold!

Need a professionally designed heap-leaching or VAT-leaching system?

πŸ“ž Call or WhatsApp:
+263 78 414 4374
+263 77 392 6249

πŸ“§ [email protected]
🌐 www.streamtecgeo.co.zw

β›οΈπŸš§ MAKAHA PROJECT UPDATE: 10,000-TONNE VAT LEACHING SYSTEMWork is progressing steadily on our 10,000-tonne VAT Leaching...
26/07/2026

β›οΈπŸš§ MAKAHA PROJECT UPDATE: 10,000-TONNE VAT LEACHING SYSTEM

Work is progressing steadily on our 10,000-tonne VAT Leaching Project in Makaha.

Our team is currently constructing the trenches and directional solution channels that will guide the solution safely and efficiently towards the collection ponds.

Progress on site includes:

βœ… Geomembrane liner welding underway
βœ… VAT tank being carefully inspected and perfected
βœ… Directional solution channels under construction
βœ… Solution ponds scheduled for reshaping today
βœ… Pipework deliveries underway
βœ… Bricks and hessian sacks already on site awaiting installation

Every component is being carefully prepared to ensure proper solution flow, containment and efficient mineral recovery once the system becomes operational.

From earthworks and geomembrane installation to pipework, solution ponds and complete processing systems, StreamTec delivers practical, scalable mining solutions designed for real production.

Another 10,000-tonne mining project being delivered by StreamTec Geosynthetics.

πŸ‘€ Follow our page and watch this project take shape!

πŸ“ž Call or WhatsApp:
+263 78 414 4374
+263 77 392 6249

πŸ“§ [email protected]
🌐 www.streamtecgeo.co.zw

🚜 NOW AVAILABLE FOR HIRE IN HARARE!Introducing our powerful 96HP BULL HD96 TLB β€” clean, reliable and ready to get to wor...
25/07/2026

🚜 NOW AVAILABLE FOR HIRE IN HARARE!

Introducing our powerful 96HP BULL HD96 TLB β€” clean, reliable and ready to get to work on your next project.

Perfect for:

βœ… Excavation and trenching
βœ… Site clearing and levelling
βœ… Loading and backfilling
βœ… Drainage works
βœ… Construction, mining and agricultural projects

Hire available on an hourly rate in Harare. Get a dependable machine and professional support for your project.

πŸ“ž Call or WhatsApp: 078 414 4374
πŸ“§ [email protected]

25/07/2026

🚜 TLB 96HP BULL AVAILABLE FOR HIRE – HARARE

Need a neat, powerful and reliable machine for your project? Our 96HP BULL TLB is ready for hire on an hourly rate in Harare.

Ideal for excavation, trenching, loading, backfilling, site clearing and general construction works.

Call or WhatsApp: 078 414 4374
Email: [email protected] | [email protected]

Address

533 Goodman Road Hatfield
Harare
263

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 09:00 - 17:00
Sunday 09:00 - 17:00

Telephone

+263784144374

Alerts

Be the first to know and let us send you an email when StreamTec Geosynthetics Pvt Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category