Sixth Century Contraction - PVT LTD

Sixth Century Contraction - PVT LTD Deck roof (rib and block decks, waterproofing etc)

Roads and surfaces designs and constru Building a better future

Floors!  Walls!  Skirtings!Get In touch with us todayOn +263 711 392 115+263 778 813 299For consultation and quotations
07/11/2022

Floors! Walls! Skirtings!
Get In touch with us today
On
+263 711 392 115
+263 778 813 299

For consultation and quotations

Floors! Floors! Floors!
07/11/2022

Floors! Floors! Floors!

Check out the modern way of finishing you homeWood, vinyl, all types ofFloorsWallpapersSkirtingCladdingAt affordable pri...
07/11/2022

Check out the modern way of finishing you home

Wood, vinyl, all types of
Floors
Wallpapers
Skirting
Cladding

At affordable prices!!!

Get In touch with us on
+263 778 813 299
0711392115

New and improvedSwimming pools ๐ŸŠFountains โ›ฒAll sizes and shapesYou! name it We! will make it flowCall or appTel:+263 778...
30/08/2022

New and improved
Swimming pools ๐ŸŠ
Fountains โ›ฒ
All sizes and shapes
You! name it We! will make it flow
Call or app
Tel:+263 778813299
For Free Quotations

๐Ÿ‘ท๐Ÿพโ€โ™‚๏ธ๐Ÿ‘ท๐Ÿฝโ€โ™€๏ธWhich stage of building are you at? *Sixth century contraction office Division *+263 778813299 *Introducing th...
26/08/2022

๐Ÿ‘ท๐Ÿพโ€โ™‚๏ธ๐Ÿ‘ท๐Ÿฝโ€โ™€๏ธWhich stage of building are you at?

*Sixth century contraction office Division *+263 778813299

*Introducing the stage by stage building plan*-
Building has atleast 20
stages
# we are offering to build 1 stage only, to all stages.

Each stage with its own

1 material schedule (contains materials required in that stage)
2 Bill of quantities ( quantit VS the rate per unit)
3 Labour rate ( Labour rate VS the scope of works)

Before construction proceeds, it is important to establish your borehole to cut water costs of buying and transporting water {essential in all the stages of building}

(important notice to our valued clients
each stage we do has 1% discount x total stages, meaning if we go through all 23 stages you get a 23% discount)

*Stage 1*.Setting out
Descriptions ( excavation of 150mm of top sois and vegetation)
1 Material schedule - Personal protective clothing, work tools
2 BOQ- $12 for each worker for all PPE requirements.
3 Labour- excavations $1.30 per m2
N. B 8-10% deposits, to cater for extra works e.g Rock Blasting and water Draining

*Stage 2* Excavation and Termite Control
Description ( digging of trenches and Termite treatments)
1) Material schedule - anti-pesticides
2) BOQ- Termite Poison $3. 5 for 5litres
3)Labour- trenching of foundation

*Stage 3*๐Ÿš๏ธ.FootingCourse work
Descriptions ( shattering, and pouring of concrete)
1)Materials schedule- Riversand, 3/4Stones ,Cement, Water
2) riversand $16 m3, 3/4 stones $30 per cubic, cement $10 per bag, pitsand $11 m3
3) Labour - pouring of 230 x 690mm concrete, $4 per meter

*Stage 4* brickwork
Descriptions (Laying of 770mm high wall over the 230mm footing)
1) Materials schedule: Bricks, Pitsand, Cement ,Impermo for wetlands and mountainous areas, Water
2) BOQ- as above
3) Labour - brick laying charged per square meter ( according to BOQ)

*Stage5*Backfilling and Termite control*
Description ( filling of gaps with in situ materials and rabble)
1) Materials: Backfilling Gravel Water, Compactor, bomag...
2) BOQ- gravel $14, bomag -
compacting machinery
3) Labour- compactor and bomag operator - $0.25 per square meter,

*Stage 6* Concrete Slab
Description( final stage of foundation works, involves laying hard floor)

1) Materials: 3/4 Stones ,Riversand,Black Polyurethane sheets, Water
2) BOQ- plastic roll $12, DPC $4....
3) Labour- N/A

*Stage 7* Superstructure.
Descriptions ( brick work)
Materials schedule- Bricks, Pitsand Grey, Cement ,Water and
BOQ - according to plan
Labour - ( Plan according to BOQ plan)

*Stage 8 *Door frame and Window Level schedule*
(installation of door frames and windows)
1) materials, frames, widows, doors
2) BOQ- interior doors, sliding doors price ranges from designs and material.
3) Labour - according to current market rate
*Stage 9*Ring Beam
Descriptions ( wallplate, still fixing, shatter of beams)
1) Materials: Shattering Timber, 3/4stones, Riversand, 12mm Deformes bars, Tying wire, Cement, Water
2) Labour ( according to scope of works)
3) BOQ - steel prices subject to change

*Stage 10* Roofworks* Schedule
Option 1 - deck Roofs-Rib and block saves up to 35 % compared to complete concrete Roofs
Option 2 - IBR flat Roofs, - new falt roof design with sheets in place of concrete, can be cobbled to look like a normal concrete roof.
Option 3- tile roofinf- according to engineers design, butterfly, common Roofs etc
NB waterproofing also available for decks
In Asphalt or torch on, water proof membranes.

*Stage 11*. Plumbing

Descriptions*Bathrooms, kitchen, Septic tank*
NB biogas installation comes with a free bio gas Generator with capacity to power all electrical appliances for domestic, except for Stoves

*Stage 12*๐Ÿ”Œ๐Ÿ”Œ๐Ÿ”Œ *Electricals and Distribution Board Connections*
Materials:Wiring, Conduits,MCBs,Plugs,sockets Connections* a
Labour ( according to BOQ plan)

*Stage 13*:* Ceilings*
( custom design ceilings)

*Stage 14*Plastering Inside and Outside walls*.
1) Materials: white Pitsand Cement ,Water

*Stage 15* Fittings
Built in Cardboards, Glass Glazing
-Materials: Wooden doors, Locks, Window Panes, Putty Thinners
- Labour - according to the scope of work

*Stage 16 *Fireproofing Skimming inside walls*
-Materials: Rhinoset
- Labour - market rate

*Stage 17* Tiling, and floors
( broad range of floors, from wood, porcelain, wallpapers etc)

*Stage 18 *Painting inside walls and outside walls*

*Stage 19*: Gutters and Storm drains

*Stage 20* Boundary walls and Gates installations

*Stage 21 *Paving, cladding and Landscaping*
Exterior finishes
According to specifications
Finishes addatives
1 modern swimming pools with whirlpool bath
2) gabions-for flowers, landscaping etc
3) cladding-for natural and long lasting effects
4) eco-energies e.g sola, biogas etc

N. B Labour and material charges may change due to market conditions.
- We build from one stage only to all stages of construction
- material supplying

163 Harare Street
Best regards
App or call our Main line
+263 778813299

RenovationsOffering  affordable rates this season!App or call +263 778813299
04/08/2022

Renovations
Offering affordable rates
this season!
App or call +263 778813299

Office partitioning ( carpentry division)Get In touch with us today+263 778813299
04/08/2022

Office partitioning
( carpentry division)

Get In touch with us today
+263 778813299

Drawings
31/07/2022

Drawings

Gabion walls for boundary walls, gardens, pillars, brandin, andcustom designs
28/07/2022

Gabion walls for boundary walls, gardens, pillars, brandin, and
custom designs

Some of the works that we have done
27/07/2022

Some of the works that we have done

Rib and block deckA cost saver type of a deck that saves 40% of the costs
14/07/2022

Rib and block deck
A cost saver type of a deck that saves 40% of the costs

Address

Harare

Opening Hours

Monday 08:00 - 20:00
Tuesday 08:00 - 20:00
Wednesday 08:00 - 20:00
Thursday 08:00 - 20:00
Friday 08:00 - 20:00
Saturday 09:30 - 21:00
Sunday 10:00 - 21:00

Telephone

+263778813299

Website

Alerts

Be the first to know and let us send you an email when Sixth Century Contraction - PVT LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Sixth Century Contraction - PVT LTD:

Share