26/08/2022
๐ท๐พโโ๏ธ๐ท๐ฝโโ๏ธWhich stage of building are you at?
*Sixth century contraction office Division *+263 778813299
*Introducing the stage by stage building plan*-
Building has atleast 20
stages
# we are offering to build 1 stage only, to all stages.
Each stage with its own
1 material schedule (contains materials required in that stage)
2 Bill of quantities ( quantit VS the rate per unit)
3 Labour rate ( Labour rate VS the scope of works)
Before construction proceeds, it is important to establish your borehole to cut water costs of buying and transporting water {essential in all the stages of building}
(important notice to our valued clients
each stage we do has 1% discount x total stages, meaning if we go through all 23 stages you get a 23% discount)
*Stage 1*.Setting out
Descriptions ( excavation of 150mm of top sois and vegetation)
1 Material schedule - Personal protective clothing, work tools
2 BOQ- $12 for each worker for all PPE requirements.
3 Labour- excavations $1.30 per m2
N. B 8-10% deposits, to cater for extra works e.g Rock Blasting and water Draining
*Stage 2* Excavation and Termite Control
Description ( digging of trenches and Termite treatments)
1) Material schedule - anti-pesticides
2) BOQ- Termite Poison $3. 5 for 5litres
3)Labour- trenching of foundation
*Stage 3*๐๏ธ.FootingCourse work
Descriptions ( shattering, and pouring of concrete)
1)Materials schedule- Riversand, 3/4Stones ,Cement, Water
2) riversand $16 m3, 3/4 stones $30 per cubic, cement $10 per bag, pitsand $11 m3
3) Labour - pouring of 230 x 690mm concrete, $4 per meter
*Stage 4* brickwork
Descriptions (Laying of 770mm high wall over the 230mm footing)
1) Materials schedule: Bricks, Pitsand, Cement ,Impermo for wetlands and mountainous areas, Water
2) BOQ- as above
3) Labour - brick laying charged per square meter ( according to BOQ)
*Stage5*Backfilling and Termite control*
Description ( filling of gaps with in situ materials and rabble)
1) Materials: Backfilling Gravel Water, Compactor, bomag...
2) BOQ- gravel $14, bomag -
compacting machinery
3) Labour- compactor and bomag operator - $0.25 per square meter,
*Stage 6* Concrete Slab
Description( final stage of foundation works, involves laying hard floor)
1) Materials: 3/4 Stones ,Riversand,Black Polyurethane sheets, Water
2) BOQ- plastic roll $12, DPC $4....
3) Labour- N/A
*Stage 7* Superstructure.
Descriptions ( brick work)
Materials schedule- Bricks, Pitsand Grey, Cement ,Water and
BOQ - according to plan
Labour - ( Plan according to BOQ plan)
*Stage 8 *Door frame and Window Level schedule*
(installation of door frames and windows)
1) materials, frames, widows, doors
2) BOQ- interior doors, sliding doors price ranges from designs and material.
3) Labour - according to current market rate
*Stage 9*Ring Beam
Descriptions ( wallplate, still fixing, shatter of beams)
1) Materials: Shattering Timber, 3/4stones, Riversand, 12mm Deformes bars, Tying wire, Cement, Water
2) Labour ( according to scope of works)
3) BOQ - steel prices subject to change
*Stage 10* Roofworks* Schedule
Option 1 - deck Roofs-Rib and block saves up to 35 % compared to complete concrete Roofs
Option 2 - IBR flat Roofs, - new falt roof design with sheets in place of concrete, can be cobbled to look like a normal concrete roof.
Option 3- tile roofinf- according to engineers design, butterfly, common Roofs etc
NB waterproofing also available for decks
In Asphalt or torch on, water proof membranes.
*Stage 11*. Plumbing
Descriptions*Bathrooms, kitchen, Septic tank*
NB biogas installation comes with a free bio gas Generator with capacity to power all electrical appliances for domestic, except for Stoves
*Stage 12*๐๐๐ *Electricals and Distribution Board Connections*
Materials:Wiring, Conduits,MCBs,Plugs,sockets Connections* a
Labour ( according to BOQ plan)
*Stage 13*:* Ceilings*
( custom design ceilings)
*Stage 14*Plastering Inside and Outside walls*.
1) Materials: white Pitsand Cement ,Water
*Stage 15* Fittings
Built in Cardboards, Glass Glazing
-Materials: Wooden doors, Locks, Window Panes, Putty Thinners
- Labour - according to the scope of work
*Stage 16 *Fireproofing Skimming inside walls*
-Materials: Rhinoset
- Labour - market rate
*Stage 17* Tiling, and floors
( broad range of floors, from wood, porcelain, wallpapers etc)
*Stage 18 *Painting inside walls and outside walls*
*Stage 19*: Gutters and Storm drains
*Stage 20* Boundary walls and Gates installations
*Stage 21 *Paving, cladding and Landscaping*
Exterior finishes
According to specifications
Finishes addatives
1 modern swimming pools with whirlpool bath
2) gabions-for flowers, landscaping etc
3) cladding-for natural and long lasting effects
4) eco-energies e.g sola, biogas etc
N. B Labour and material charges may change due to market conditions.