Planning Walkways and Bypasses Before Drawings Are Final
Pedestrian routes and bypasses are often the first things cut when a budget tightens, and the last things anyone wants to retrofit.
We deal with this early. During preconstruction, we work with the owner and design team on siting, constructability, budget and scheduling, so walkway and access road decisions are priced against the actual drawings.
Our civils team designs and builds access roads, urban roads, walkways, bypasses and bridges. That includes work as main contractor or as a partner on larger design and construct projects, including PPPs.
A survey of land size and measurements at the outset also gives engineers and architects firm figures to work from.
Which part of your next development is hardest to resolve at the design stage: pedestrian access, vehicle bypasses or drainage?