CASE Concreting

Call Directions Website

CASE Concreting All aspects of concreting. No job too small or big.

Two new stair sets completed in Melrose Park for a local school project.Good progress on site and another clean concrete...
22/10/2026

Two new stair sets completed in Melrose Park for a local school project.

Good progress on site and another clean concrete result from the CASE crew.

Basement slab completed in Bondi Beach.🏖️ Working underneath a fully constructed building made access and logistics chal...
07/10/2026

Basement slab completed in Bondi Beach.🏖️

Working underneath a fully constructed building made access and logistics challenging, but the standard stayed the same.

Clean ex*****on, solid coordination and a finish we’re proud of.

Progress this week at Melrose Park High School.New stair formwork completed and ready for the next stage of the build.Go...
25/09/2026

Progress this week at Melrose Park High School.

New stair formwork completed and ready for the next stage of the build.

Good progress on site and another piece of the project taking shape.

Fresh concrete down in Kingsford.A new patio slab completed and ready for the next stage of the build.Big job or small j...
11/09/2026

Fresh concrete down in Kingsford.

A new patio slab completed and ready for the next stage of the build.

Big job or small job, we bring the same care to the finish.

Another important stage completed today on our Maroubra project.We poured the new pedestrian footpath bridge over the ga...
08/09/2026

Another important stage completed today on our Maroubra project.

We poured the new pedestrian footpath bridge over the garage entry, following the formwork and reinforcement works completed over the previous stages.

The new bridge replaces the previous structure and forms part of the required pedestrian access along the property frontage.

Next step will be stripping the formwork and revealing the finished concrete structure.

Progress update from Maroubra.This project involves the construction of a new pedestrian footpath bridge over the garage...
25/08/2026

Progress update from Maroubra.

This project involves the construction of a new pedestrian footpath bridge over the garage exit, required by council and supported by two columns over 4 metres high.

The previous bridge was demolished to allow for the new structure, and our team is currently completing the formwork in preparation for the concrete works. It’s a critical stage that sets up the strength, accuracy and finish of the final result.

We’ll share the completed outcome soon.

Not sure what N20, N25, N32 or N40 concrete actually means?Our latest guide explains concrete strength grades, slump, ag...
14/08/2026

Not sure what N20, N25, N32 or N40 concrete actually means?

Our latest guide explains concrete strength grades, slump, aggregate size and coloured concrete in practical terms—helping homeowners, builders and project teams understand what affects concrete selection and performance.

Read the complete guide:
https://caseconcreting.com.au/concrete-mpa-slump-guide-sydney/

The correct concrete specification should always reflect the structural design, site conditions, placement method and intended use.

Precision starts long before the concrete pour. 👷‍♂️Progress on this custom off-form slab in Bondi Beach, where every de...
11/08/2026

Precision starts long before the concrete pour. 👷‍♂️

Progress on this custom off-form slab in Bondi Beach, where every detail of the formwork matters.

With off-form concrete, the plywood becomes part of the final finish. Every joint and every line will be visible once the forms are stripped, so precision at this stage is critical.

For this project, each piece of plywood is individually cut and positioned to create the exact pattern and concrete finish specified by the client.

The slab frames and beam formwork are now taking shape, with plenty more detail still to come before we’re ready for the pour.

A quality off-form finish starts with quality formwork.

Wrapping up the week with this residential access staircase project in Sydney.The original entry had a steep ramp that m...
24/07/2026

Wrapping up the week with this residential access
staircase project in Sydney.

The original entry had a steep ramp that made
access difficult. We replaced it with concrete
stairs — safer, more functional and a much better
look for the front of the home.

Residential concreting across Sydney & surrounds —
get in touch for a free no-obligation quote.

📞 0421 932 072
đź“© [email protected]
đź”— caseconcreting.com.au

Custom octagonal concrete slabs — Horsley Park, Western Sydney.These industrial concrete pads were designed and built to...
14/07/2026

Custom octagonal concrete slabs — Horsley Park, Western Sydney.

These industrial concrete pads were designed and built to support large water storage containers at an industrial facility in Horsley Park.

Custom formwork, steel reinforcement and a clean finish, every detail done to spec.

Swipe through to see the process from formwork and steel to the finished result.

Industrial concreting across Sydney & surrounds, get in touch for a free quote.

📞 0421 932 072
đź“© [email protected]
đź”— caseconcreting.com.au

Address

Galston, NSW
2157

Alerts

Be the first to know and let us send you an email when CASE Concreting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Nearby contractors