10/29/2026
PROJECT SPOTLIGHT | Built to Fit
📍 Cold Lake Operations Centre | Cold Lake, AB
From our fabrication shop to the jobsite!
For the Cold Lake Operations Centre, our team prefabricated complex mechanical assemblies in-house before transporting them to site for installation.
This approach allows us to complete detailed mechanical work in a controlled shop environment while streamlining the installation process on site.
From boiler systems and piping assemblies to air-handling equipment, this project showcases the planning, coordination, and craftsmanship behind our work.
Proud of our team and the quality they bring to every stage of a project!
Powered by Process. Built with Purpose.