20 metres of trench. 100 tonnes of rubble. One mains water pipe safely exposed.
This Oxford job started as an 8m trench before being extended to 20m to accommodate additional connections.
With 100 tonnes of rubble removed across 10 tipper loads, it was a substantial excavation.
So, why use vacuum excavation instead of relying solely on mechanical digging?
Vac-ex allows material to be removed in a controlled way around existing underground services, helping reduce the risk of accidental damage while keeping the excavation precise.
When working around essential utilities, that extra control matters.