28/08/2026
A recent hand lay project completed by the Elm Surfacing team at a school in Canterbury, covering a total area of
The works involved surfacing an excavated area, as well as overlaying the existing asphalt, creating a consistent and hard-wearing finished surface. The specification included AC20 laid at 60mm, followed by AC10 at 40mm.
Working around an existing school environment, the team focused on achieving a neat finish while ensuring the new surface tied in effectively with the surrounding areas.
Another project delivered by the Elm Surfacing team, with the job completed from preparation through to the finished asphalt surface.
For hand lay, resurfacing and reinstatement works across Kent, get in touch with Elm Surfacing.
https://www.elmsurfacing.com/
01795 430233
www.elmsurfacing.com