13/11/2026
Another Job Completed by Gray Construction and Maintenance! 💪🔨
📍 Weymouth Town Bridge
Another big transformation finished today! 👌
The chimney was in a very poor condition and needed some serious attention to bring it back to life.
✅ Installed steel strengthening bars to reinforce the chimney structure.
✅ Removed all damaged and deteriorating render.
✅ Sealed and treated the exposed brickwork.
✅ Installed new PVC angle beads for a clean, sharp finish.
✅ Applied a fresh scratch coat followed by a top coat of render.
✅ Finished with fresh white Sandtex masonry paint.
🏠 Rear of the Property
The brickwork at the rear had suffered extensive damage from previous sandblasting, so we carried out the following works:
✅ Treated and prepared all damaged brickwork.
✅ Re-rendered the entire rear of the property.
✅ Finished with fresh white Sandtex masonry paint, giving the building a clean, fresh new look!
💧 Drainage Improvements
Finally, we installed new ACO drainage channels along the rear of the property and halfway up the garden to help manage surface water and prevent further flooding.
💪 A lot of hard work has gone into this project, but the finished result makes it all worthwhile!
Another property restored, protected and looking fresh again! 👌🏠
🔨 GRAY CONSTRUCTION AND MAINTENANCE
📞 07808 719175
📱 Facebook: construction and maintenance
Quality workmanship from start to finish! 💪