13/06/2026
From car park to full-scale play space. ๐โโ๏ธ
St. Patrick's Boys National School in Donabate came back to us for Phase 2 - and this time we went all out. A full-size MUGA, a coloured running track, multi-use pitch markings, and a custom STOP sign that tells parents exactly where the boundary is. The yard belongs to the students now. ๐ฏ
Every detail was designed around the school day - not just break time. Number boxes along the perimeter for fire drills and class organisation. Artificial grass running right to the building entrance. A shockpad layer underneath for impact absorption. A surface that handles rain, cold, and daily foot traffic without losing its shape. โ
Low maintenance for the school. High performance for the students.
If your school yard could be doing more, get in touch with the SchoolsGrass team today.