On large civil drainage projects, the biggest risks show up before we get to site.
That's why we get across the planning early. Geotech reports, Watercare and Council on the EPAs, a skilled engineer behind the drawings. Get those sorted and the plans are solid, which means fewer surprise costs later.
Then it's the ground. How deep, any bedrock, do we need to dewater? Easy to check early, and it makes a real difference to the final cost.
A bit spent on investigations up front saves a lot on the job.