27/09/2025
we have just completed this very special job at 32 awatea road in Parnell, the cliff subsided on the 4 properties in the flooding rains just after cyclone Gabrielle and had to be rebuilt, along with the houses and the driveway, a very lengthy process ,new cespits and stainless steel channels were installed with double pipes away into massive stormwater chambers making this a very challenging process on the driveway with hips, valleys,swales,and falls directing the stormwater correctly to never flood the houses again we did a mungatroto chip with a black oxide base and a central circle and parking bays in long burn pebble mix, and black oxide, as a feature acid washed, with a sealer to still complete, many thanks to urban living builders, altas concrete, Pioneer concrete pumps, hydro specialists, diamond cutters, all the other trades involved my team,jacob, dean, craig,hamish the residents and surrounding neighbors and neighborhood for your kindness and patients to help in completing the process and making the job run as smoothly as possible