03/11/2026
Accurate construction joint formation is an important part of concrete pouring operations. HY-RIB provides a practical permanent formwork solution that helps create mechanically bonded joints between successive concrete pours.
• Designed for forming construction joints in concrete structures
• Provides permanent formwork for staged concrete pouring
• Supports mechanical bonding between adjacent concrete sections
• Suitable for building and infrastructure construction applications
📞 0543514030
✉️ [email protected]
🌐 https://spec-smcc.com
💬 https://wa.me/966543514030