Jensen's Concrete Pumping

Jensen's Concrete Pumping Jensen's Concrete Pumping was founded in 2001 to provide high quality line pump equipment and services.

08/31/2026

Concrete mixer ASMR

🫶 Thomas Concrete

08/24/2026

POV: you work in concrete pumping

Our work day starts here. šŸ‘†Usually the sun’s not even up yet. Usually it’s pitch black. But today, we get to reflect on ...
08/17/2026

Our work day starts here. šŸ‘†

Usually the sun’s not even up yet.

Usually it’s pitch black.

But today, we get to reflect on how lucky we are that we get to serve our city and our industry every single day

and have been doing so for 20+ years.

The best part of waking up?

Coffee in a Jensen’s cup. ā˜•ļø

08/10/2026

POV: you’re getting concrete from your bestie at 5am šŸ‘Æ

Working beside an active rail line means the concrete is only one part of the operation.Access is tighter.Staging option...
08/05/2026

Working beside an active rail line means the concrete is only one part of the operation.

Access is tighter.

Staging options are limited.

Communication matters more.

And the crew does not get to spread equipment wherever it happens to be convenient.

That is exactly where a line pump earns its place.

Atlanta and North Georgia are full of projects like this.

Jobs where the concrete placement looks simple until somebody asks how the concrete is actually getting there.

On difficult Georgia job sites, the pumping plan is the pour plan.

Everything else depends on getting that part right.

Jensen’s has been pumping concrete across this city since 2001.We’ve worked beside Atlanta landmarks, underneath its str...
08/03/2026

Jensen’s has been pumping concrete across this city since 2001.

We’ve worked beside Atlanta landmarks, underneath its streets and behind the walls most people will never think twice about.

This photo feels pretty fitting.

A piece of Atlanta history behind a piece of equipment that has spent more than 20 years helping build Atlanta’s next chapter.

Being local isn’t putting a peach emoji in your LinkedIn bio.

It’s knowing the job sites.

Knowing the contractors.

Knowing the traffic.

Knowing that ā€œinside the Perimeterā€ can add an hour to a day before the pump is even turned on.

And knowing how to get concrete where the ready-mix truck cannot.

Plenty of companies serve Atlanta.

We’re from here.

There’s a difference.

The crew didn't need to talk much.If you watched from a distance, you'd think not much was happening.Nobody was yelling....
07/29/2026

The crew didn't need to talk much.

If you watched from a distance, you'd think not much was happening.

Nobody was yelling.

Nobody was asking what to do next.

Everyone just kept moving.

The hose was where it needed to be.

The pump operator adjusted the flow without anyone saying a word.

Cleanup started before the last of the concrete was placed.

That's what happens when a crew has worked together for a long time.

You stop reacting to each other.

You start anticipating each other.

It doesn't mean every day is perfect.

It means everyone understands the job, trusts the people around them, and knows that doing their part keeps the whole pour moving.

Good chemistry is about knowing you can count on the person next to you.

That's something you can't buy with a new pump or a bigger crew.

Some contractors still think pumping is an extra cost.We think that's looking at the job the wrong way.Yes, there's a li...
07/27/2026

Some contractors still think pumping is an extra cost.

We think that's looking at the job the wrong way.

Yes, there's a line item on the invoice.

But what doesn't show up on that invoice?

The labor you didn't need.

The hours you didn't lose.

The wheelbarrows you didn't push.

The extra cleanup you didn't have to do.

The delays you avoided because concrete got exactly where it needed to go, when it needed to get there.

The cheapest option isn't always the one with the lowest upfront price.

It's the one that helps the entire project run more efficiently.

If pumping allows your crew to place concrete faster, reduces labor, minimizes disruption, and keeps the schedule moving, was it really an extra cost?

Or was it one of the best investments on the job site?

The best compliment we've ever heard?"We didn't have to worry about you."Not the biggest job.Not the fastest pour.Not ev...
07/22/2026

The best compliment we've ever heard?

"We didn't have to worry about you."

Not the biggest job.

Not the fastest pour.

Not even, "Great work."

Just knowing that when we showed up, everything was going to be handled.

That's what every contractor is really looking for.

Not another subcontractor to manage.

A partner they don't have to think about.

Every job site has someone watching.The superintendent.The homeowner.The inspector.And sometimes...A little kid standing...
07/20/2026

Every job site has someone watching.

The superintendent.

The homeowner.

The inspector.

And sometimes...

A little kid standing behind the fence who hasn't taken his eyes off the pump truck since you pulled in.

To us, it's another day at work.

To him, it's the coolest thing he's seen all week.

You never know who's learning what pride in your work looks like just by watching you do it.

Address

801 South Cobb Drive SE, Suite 100
Marietta, GA
30060

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 12am - 12am

Telephone

+17706440066

Alerts

Be the first to know and let us send you an email when Jensen's Concrete Pumping posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Jensen's Concrete Pumping:

Shortcuts

Share

Category