11/03/2026
The day before we pour an ICF foundation.
All the ICF walls are up on our ADU in Beverly, MA, and the rebar is set inside the forms. The crew is getting the bracing in.
That wood platform running around the whole foundation is for pour day. When the pump arrives, the crew walks the platform and holds the pump as the concrete goes into the walls.
The back walls run a little taller than the rest. Next up: the pour.