RJV Operating since 1955, RJV is WA’s most established civil construction and mining contractor.

We bring a 65+ year history of proven performance in the delivery of civil infrastructure, mining services, marine infrastructure and urban renewal.

Team RJV was out in force last Sunday - taking on either the 4km or the 12km from Perth City to City Beach for the Chevr...
04/09/2026

Team RJV was out in force last Sunday - taking on either the 4km or the 12km from Perth City to City Beach for the Chevron City to Surf for GenU .

The conditions were kind, the blue shirts were everywhere and a fabulous time was had by all.

Thanks to everyone who got up early and laced up!

Congratulations to all our clients with nominations in this year's Urban Development Institute of Australia WA (UDIA WA)...
28/08/2026

Congratulations to all our clients with nominations in this year's Urban Development Institute of Australia WA (UDIA WA) Awards for Excellence!

We're proud to have provided civil construction services to the following projects, all in the running for category awards:

- Nominated for Sustainability Excellence - 1909 Subi East by DevelopmentWA
- Nominated for Marketing Excellence - Ariella Henley Brook by Cedar Woods
- Nominated for Masterplanned Communities Excellence - Catalina Estate by Satterley Property Group & Catalina Regional Council
- Nominated for Affordable Housing Excellence - Eglinton Village Ready Set Build by Cedar Woods

Wishing everyone the very best of luck at the Gala Dinner on 12 September 2026.

New client, new site!RJV has been awarded Stage 1 works at Lot 2029 Forrest Road for 828 Property - our first project wi...
26/08/2026

New client, new site!

RJV has been awarded Stage 1 works at Lot 2029 Forrest Road for 828 Property - our first project with this client. The scope covers bulk earthworks and full civil construction as part of the broader 85-lot residential development.

We’re looking forward working with 828 and continuing to strengthen that relationship as well as alongside JDSi Consulting Engineers.

Learn more: https://rjv.com.au/rjv-awarded-stage-1-works-at-lot-2029-forrest-road/

Team RJV is lacing up again!On Sunday 30 August we will be out again for the 2026 City to Surf with some taking on the 1...
20/08/2026

Team RJV is lacing up again!

On Sunday 30 August we will be out again for the 2026 City to Surf with some taking on the 12km from St Georges Terrace, others the 4km from McLean Park in Floreat.

It’s become one of the highlights of the RJV calendar: office and site, families included and everyone out together on a Sunday morning.

If you spot a wall of RJV shirts somewhere, that’s us!

Zero safety issues!That was the result our Treeby site team returned in their recent safety audit.Excellent job, team. R...
18/08/2026

Zero safety issues!

That was the result our Treeby site team returned in their recent safety audit.

Excellent job, team. Results like this don’t come from a tidy site on the day. They come from crews who plan the work properly, raise things early and follow process to allow completion of work at high standards.

13/08/2026

Two new Caterpillar CS13 GC rollers join our fleet!

To strengthen our operational capability and keep pace with the increasing demand across our civil and urban construction projects, RJV has recently invested in the purchase of two additional Caterpillar CS13 GC Vibratory Soil Compactors.

This strategic investment further enhances our fleet capacity and ensures our teams have access to modern, reliable equipment capable of meeting the diverse requirements of our projects throughout the region.

A key advantage of these rollers is their suitability for working in and around sensitive environments and critical infrastructure corridors. The micro vibe-controlled vibration capabilities allow operators to achieve required compaction specifications while minimising the risk of disturbance to existing underground services, utilities and surrounding infrastructure. This makes them particularly valuable for urban developments, subdivision works, road upgrades, and projects where the protection of existing assets is paramount.

Two more stages, both already underway.RJV has recently been awarded and mobilised on:•        Catalina Stage 47 for Cat...
11/08/2026

Two more stages, both already underway.

RJV has recently been awarded and mobilised on:
• Catalina Stage 47 for Catalina Regional Council
• Jindalee Stage 18B - Jindee Interface for MQ1 Land Syndicate

Well done to the crews keeping these projects progressing.

The Diggers & Dealers Mining Forum is in full swing in Kalgoorlie this week!Our COO, Jason Fletcher and General Manager ...
04/08/2026

The Diggers & Dealers Mining Forum is in full swing in Kalgoorlie this week!

Our COO, Jason Fletcher and General Manager Mining Services, Gregg Ireland, are on the ground as delegates for our Mining Services division - connecting with industry and sharing RJV's expertise in civil construction for WA mining and regional projects.

With 70+ years of delivery excellence and a 200+ mine-spec owned fleet, we're built to support your next project.

At Diggers & Dealers and keen to connect? DM Jason and Gregg. (Pictured here with a 500kg gold bar worth $95 million!)

Sustainable offices have arrived at our Malaga workshop ☀️As part of our ongoing commitment to sustainability, we have n...
15/07/2026

Sustainable offices have arrived at our Malaga workshop ☀️

As part of our ongoing commitment to sustainability, we have now completed phase 1 of our energy and infrastructure upgrade at our Malaga workshop thanks to TCD Civil Construction. Two smart infrastructure transportable buildings, integrated with a 24kWh battery system and 24 515W solar panels, have been purpose-built for RJV's operational needs.

Designed to work with the energy system, their high thermal efficiency enables a compact, efficient off-grid setup. The solar installation is expected to generate around 20,000kWh annually (~54kWh/day) - ample surplus to also power the site's southern domes and ablution facilities. Independent testing shows the buildings average 8dBA quieter than a conventional transportable office.

Phase 2 will expand the system with a 200kWh battery and 60 additional solar panels, creating a scalable platform that supports site growth while reducing reliance on diesel power.

Practical completion achieved at Skyfields! 🎉RJV is proud to have completed our scope at Skyfields by Perth Airport - ou...
09/07/2026

Practical completion achieved at Skyfields! 🎉

RJV is proud to have completed our scope at Skyfields by Perth Airport - our first project with this new client. Located in the West South (Dunreath Green) precinct, the early works spanned approximately 26 hectares within the Airport Estate, preparing the site for future commercial and industrial development.

Our scope covered clearing and topsoil removal, processing and management of topsoil, removal of excess vegetation offsite, and site stabilisation. The precinct is now fully stabilised and ready for follow-on works.

Address

5 Kirke Street
Perth, WA
6021

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+61893453999

Alerts

Be the first to know and let us send you an email when RJV posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to RJV:

Shortcuts

Share

Category