Dan Smith Plastering

Dan Smith Plastering We specialise in all forms of internal and external plastering and textured finishes. Call now for a FREE QUOTE! | Stroud Plastering |

A cracking 3 days….Wall studded out to get over air conditioning conduit, insulated and plaster boarded…2  windows insta...
02/04/2026

A cracking 3 days….
Wall studded out to get over air conditioning conduit, insulated and plaster boarded…
2 windows installed….
En-suite ceiling plastered along with the rest of the work with a couple of other walls for good measure!!! …. BOOM 💥

You must know the drill by now..🤔

‘It’s not all plastering ‘

Great to have a spell of half decent weather… we’ve taken half the roof off and built a dorma. Now…. let’s get to the ne...
26/03/2026

Great to have a spell of half decent weather… we’ve taken half the roof off and built a dorma.
Now…. let’s get to the next job, wait for the windows to arrive and a decision for the en-suite…!!!!

‘It’s not all plastering ‘

Massssssive shift….  !!!!20.5 tons of floor screed put down…💪 The boys should sleep well tonight… Big thanks for the eff...
13/03/2026

Massssssive shift…. !!!!

20.5 tons of floor screed put down…💪

The boys should sleep well tonight…
Big thanks for the effort…👊👊👊 .p.03

03/03/2026

Back for a couple of days…
on the digger getting the drainage in…
Now waiting for another delivery of bricks..

A super 3 days boarding out and plastering this extension   A big effort from the boyyys!!!
26/02/2026

A super 3 days boarding out and plastering this extension
A big effort from the boyyys!!!

Our little gap filler job is going full beans!!! With 3000 bricks laid…It’s not all plastering   We are actually off to ...
23/02/2026

Our little gap filler job is going full beans!!!
With 3000 bricks laid…

It’s not all plastering

We are actually off to do some plastering tomorrow….

Great little gap filler of a job for the team  It’s a new one for us… reclaimed bricks laid down herringbone pattern for...
17/02/2026

Great little gap filler of a job for the team

It’s a new one for us… reclaimed bricks laid down herringbone pattern for a patio area.. ❤️

‘It’s not all plastering ‘

15/02/2026
Stage 2 of this garden project, slabs laid…Want to get ready for summer??? ‘It’s not all plastering  ‘
11/02/2026

Stage 2 of this garden project, slabs laid…

Want to get ready for summer???

‘It’s not all plastering ‘

A great couple of days boarding out and plastering these two rooms… Powered by a pack of beetroot 2eggs and 2 oranges   ...
06/02/2026

A great couple of days boarding out and plastering these two rooms…
Powered by a pack of beetroot 2eggs and 2 oranges

These are the type of messages we love  …I haven’t stopped smiling since reading it!!! 😂😂
04/02/2026

These are the type of messages we love …
I haven’t stopped smiling since reading it!!! 😂😂

Another job done….rotten roof repaired… Full rip out… 140mm celotex in the ceiling…. 63mm insulation dry lined on extern...
29/01/2026

Another job done….rotten roof repaired… Full rip out… 140mm celotex in the ceiling…. 63mm insulation dry lined on external walls… new socket added…. Lights moved…. New radiator…. Skirting board and all plastered ready to paint….

‘It’s not all plastering ‘

Address

Stroud

Alerts

Be the first to know and let us send you an email when Dan Smith Plastering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Dan Smith Plastering:

Share

Category