04/09/2026
Another home. Another complete transformation.
This time, the renovation began by stripping the house back and removing all the rotten framing and cladding before reframing and recladding the entire exterior.
The result is a home that has been completely reworked, inside and out.
✨ New roof and redesigned roofline
🛁 Ensuites added to all three existing bedrooms
🛏️ New bedroom and ensuite above the garage
🚿 Renovated powder room
🍳 Completely redesigned kitchen
🌿 New decks and joinery
🧱 New retaining walls
🚗 New carparking space
🌱 New fencing and gardens
The site itself added another layer of complexity. Shared driveway access, a unique site layout and challenging drainage meant careful planning was essential, with specialist soak holes, Geotech input and technical retaining and structural steel work all part of the project.
As with the first home, we worked closely with watertight specialists and council throughout the restoration to ensure the work met the necessary compliance and technical requirements.