08/26/2026
Ready for Crete! 2 inch foam board (R-10) around the perimeter 2 foot down below grade. And foam underneath the entire  concrete floor.
With plastic under foam. And wire mesh laid on top foam ready for the concrete crew.
Northern Ohio gets pretty cold 🥶