Snyder Environmental Services LLC

Snyder Environmental Services LLC Building stronger communities through innovative environmental and infrastructure solutions.

Our work doesn’t always end when the underground work is complete.Our paving crew helps put the finishing touches on our...
09/01/2026

Our work doesn’t always end when the underground work is complete.

Our paving crew helps put the finishing touches on our projects, restoring surfaces and making sure the job is completed with the same attention to quality from start to finish.

From utility and infrastructure work below ground to the finished surface above, having these capabilities in-house helps keep projects moving and allows us to provide a more complete solution for our customers.

It’s another part of what we do and another crew we’re proud to have representing Snyder.

Great work by our paving crew!👏

Quality work doesn’t just come from the finished product. It comes from the planning, the teamwork, the experience, and ...
08/28/2026

Quality work doesn’t just come from the finished product. It comes from the planning, the teamwork, the experience, and the attention to detail that goes into every step along the way.

Taking pride in the little things is what makes a difference in the bigger picture.

Here’s to another week of getting the job done right. Have a great weekend!

Yesterday, we were proud to celebrate the completion of the Wardensville Infrastructure Improvement Project at the ribbo...
08/27/2026

Yesterday, we were proud to celebrate the completion of the Wardensville Infrastructure Improvement Project at the ribbon-cutting ceremony in Wardensville, West Virginia.

Snyder Environmental Services worked alongside the Town of Wardensville and engineers from RK&K to complete significant upgrades to the town’s wastewater treatment facility and sewer infrastructure.

The project included the construction of new chemical feed/process control and screening buildings, installation of new treatment equipment and automated controls, new lagoon aerators and a backup generator, replacement of aging piping and valves throughout the plant, and rehabilitation of sewer manholes across town to help reduce groundwater infiltration.

These improvements transformed an aging system that was working to keep pace with regulatory requirements into a more reliable and efficient system with room to support Wardensville’s future growth.

Projects like this are a great example of the impact infrastructure work has beyond the jobsite. Reliable water and wastewater systems are essential to protecting communities, supporting growth, and providing dependable service for years to come.

A special shoutout to Lisa Miller, Project Manager, and Don Duriez, Project Superintendent, who represented Snyder Environmental Services at yesterday’s ribbon-cutting ceremony. We’re proud of their work and the entire team that helped bring this project to completion.

Thank you to the Town of Wardensville, RK&K, and everyone involved in making this project a success. We’re proud to have played a part in an investment that will serve the Wardensville community well into the future.

Friday Reminder: Hard work. Teamwork. Pride.👷‍♂️Behind every successful project is a team of people committed to doing t...
08/21/2026

Friday Reminder: Hard work. Teamwork. Pride.👷‍♂️

Behind every successful project is a team of people committed to doing the job right. At Snyder Environmental Services, hard work, dedication, experience, and teamwork are at the core of what we do.

From our crews in the field to our team in the office, every person plays a part in keeping projects moving and delivering the quality of work Snyder is known for. We’re proud of the people who represent SES and the work they put in every day.

Here’s to finishing the week strong. Have a great weekend!

A closer look at one of Snyder Environmental Services’ core trenchless capabilities: Horizontal Boring & Jacking.Since 1...
08/18/2026

A closer look at one of Snyder Environmental Services’ core trenchless capabilities: Horizontal Boring & Jacking.

Since 1979, Snyder Environmental Services has provided trenchless construction services throughout the Mid-Atlantic region, completing underground crossings in a wide variety of ground conditions.

Our experienced bore crews have successfully completed crossings ranging from 4" to 60" beneath highways, railroads, streams, wetlands, buildings, high-pressure gas mains, protected trees, and other structures - all while minimizing disruption to the surface above.

Snyder Environmental typically operates multiple bore crews, each equipped with the tools and specialized equipment needed to complete projects safely and efficiently. We also have Certified Welder credential holders on each of our bore crews and maintain an extensive fleet of company-owned boring, jacking, tunneling, and support equipment.

Our capabilities include:

• Conventional Horizontal Boring & Jacking through dirt and rock
• Steered Pilot Tube Boring using a Guided Boring Machine (GBM)
• Reinforced Concrete Pipe (RCP) jacking
• Mechanized tunneling using a Tunnel Boring Machine (TBM)
• Rock boring using Robbins SBU disc cutter heads
• Cement grouting of annular spaces between carrier pipes and casings
• Pneumatic ground piercing for small service lines
• Service line installation using the TT Technologies GrundoPit system
• Pipe Bursting
• Slip Lining

Our experienced crews understand the equipment, ground conditions, and challenges that come with underground construction. We take pride in the work we complete and, in our ability, to work through challenging conditions to deliver quality results on every project.

It’s another part of what makes Snyder Environmental Services a trusted partner for underground infrastructure projects throughout the Mid-Atlantic.

Please join us for the Annual Cynthia Snyder Memorial Blood Drive as we honor Cynthia’s memory by giving the gift of lif...
08/14/2026

Please join us for the Annual Cynthia Snyder Memorial Blood Drive as we honor Cynthia’s memory by giving the gift of life.❤️

Friday, September 18, 2026
12:00 - 5:00 PM
Location: Snyder Environmental Services, LLC
270 Industrial Blvd., Kearneysville, WV

Blood donations made at this drive will help patients throughout our region and continue the incredible legacy created in Cynthia’s memory.

To schedule your donation, visit the American Red Cross website or call 1-800-RED CROSS and use Sponsor Code: SNYDER.

We hope you’ll join us in honoring Cynthia and helping save lives❤️

!!We’re Hiring: Estimator / Project Manager!!Snyder Environmental Services is once again seeking an experienced Estimato...
08/14/2026

!!We’re Hiring: Estimator / Project Manager!!

Snyder Environmental Services is once again seeking an experienced Estimator / Project Manager to join our growing team in Kearneysville, WV.

This position plays a key role in both estimating and managing heavy civil and underground utility projects - from preparing competitive bids to overseeing awarded projects through completion.

We’re looking for someone with:
• 3–5 years of estimating and/or project management experience
• Experience in heavy civil or underground utility construction
• Knowledge of water & sewer infrastructure, excavation, earthwork, and site development
• Experience with HCSS Heavy Bid
• Strong communication, organization, and project management skills

If you’re ready to take the next step in your career with a growing company, we’d love to hear from you.

Kearneysville, WV
Apply today: https://www.snyderenv.com/careers/

Know someone who could be a great fit? Please share this post or tag them below!

At Snyder Environmental Services, our work is guided by more than the projects we complete - it's guided by the values w...
08/12/2026

At Snyder Environmental Services, our work is guided by more than the projects we complete - it's guided by the values we bring to every job, every partnership, and every interaction.

Our core values shape how we serve our clients, support our team, and strengthen the communities where we work. From prioritizing safety and integrity to building lasting relationships and delivering quality results, these principles are at the heart of everything we do.

We're proud of the culture we've built and remain committed to upholding these values every day.

Snyder Environmental Services is proud to be a COSTARS Approved Supplier⭐
08/06/2026

Snyder Environmental Services is proud to be a COSTARS Approved Supplier⭐

08/04/2026

Many hours of hard work... all captured in just 2 minutes!

Take a behind-the-scenes look at one of our biggest trenchless rehabilitation liners to date.

Our crew rehabilitated an existing 40" × 55" elliptical storm drain in a residential neighborhood in Middletown, PA, by installing 229 feet of 48" THERMOFORM liner.

Before the THERMOFORM liner can be installed, the existing pipe must first be carefully inspected and prepared.

Using CCTV equipment, we inspect the inside of the pipe to evaluate its condition and identify any debris, defects, or obstructions. The line is then thoroughly cleaned to create the proper conditions for installation.

Next, the THERMOFORM liner is heated to make the PVC soft and flexible, allowing it to be pulled through the existing pipe. Once in place, the liner is reheated and expanded until it conforms to the shape of the host pipe. After it cools and hardens, it forms a structural and durable new pipe within the old one - extending the life of the infrastructure while minimizing excavation and disruption to the surrounding neighborhood.

🏆This project marks the largest THERMOFORM liner installation Snyder Environmental Services has completed to date.

As you watch the video, you’ll see each step of the process:

-CCTV inspection of the existing pipe
-Pipe cleaning and preparation
-Heating the THERMOFORM liner to make it soft and flexible
-Pulling the liner into the existing pipe
-Reheating and expanding the liner to fit the host pipe
-The finished rehabilitated pipe

A huge thank you to our crew for their hard work, dedication, and commitment to making this project a success.

We're proud of what our team accomplished and excited to continue taking on projects like this while sharing more behind-the-scenes looks at the work we do every day.

Address

270 INDUSTRIAL Boulevard
Kearneysville, WV
25430

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 4pm

Telephone

+13047259140

Alerts

Be the first to know and let us send you an email when Snyder Environmental Services LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share