08/05/2026
🌱 Check this out! 🌱
This customer contacted us after Consumers Energy cleared trees and brush beneath the power lines on their property. While the work was necessary, it left them with a large bare area they wanted to clean up, improve the appearance of, and put to better use.
We came in, cleaned up the area, spread high-quality screened topsoil, and hydroseeded the entire space.
Check out the before and after!
The photos of the finished lawn were taken just 4 weeks after hydroseeding. With proper site preparation, quality materials, and the right aftercare, your new lawn can be ready for mowing in about four weeks, just like this one.
🍂 Fall is the perfect time to install a new lawn! Cooler temperatures and more consistent moisture create ideal growing conditions, so now is the time to get your project on the schedule before our schedule fills up.
📞 Call us today: 616-326-5456
🌐 Visit us: https://gslawncaremi.com/
Let's turn your bare, unusable space into a beautiful lawn you'll enjoy for years to come!