21/05/2026
Busy week... from prep last friday too now.
Shuttering and concrete poured.
Block layed and frame work put up.. then roof joists installed, breathable membrane, window and door fitted. Next up will be lowering the old roof and under felt and capping felt too go on once all adjusted and boarded hopefully get this done tomorrow so can felt over the weekend. Slowly coming together